TopRound

City Of Chula Vista
Visitors Residents Businesses Top Navigation Bar
Like Us on Facebok   Follow us on Twitter - ThinkChulaVista!   

   
City of Chula Vista Site Map Contact Us City Calendar of Events Frequently Asked Questions City Services What's New In Chula Vista Chula Vista Attractions About Chula Vista Chula Vista Home
Public Works arrow
Engineering
arrow
 

About Us
Bikeway Master Plan
Capital Improvement Program
Fiscal Services
Infrastructure Services
Pavement Management
Pedestrian Master Plan
Real Property
Safety Commission
Sewer Rate
Transportation Services
Wastewater Engineering
Wastewater Reclamation Facility Feasibility Study

Service Requests
Contact Us
FAQs

 
   
       
  Public Works
       
   

Wastewater Reclamation Facility Feasibility Study

Background

The purpose of the Wastewater Reclamation Facility Feasibility Study is to analyze various options available to meet the City of Chula Vista's long-term sewer treatment capacity needs. As a part of the study, our consultant, RMC Water and Environment (RMC), is required to evaluate the option of constructing a wastewater treatment facility in Chula Vista in comparison to the option of purchasing additional treatment capacity rights in the Metropolitan Wastewater Department (Metro) of the City of San Diego.

Click to Enlarge

Statistics on the Project

  • Chula Vista currently has 20.86 million gallons per day (mgd) of allocated wastewater treatment capacity rights in the Metro system.
  • Currently, Chula Vista generates about 16 mgd.
  • Based on current trends, the City could reach 22 mgd in the next decade.
  • Per the 2005 Wastewater Master Plan, the City could reach 26.2 mgd by buildout.
Project Implementation Requires Many Years
Click to Enlarge

To meet this capacity shortage, the City has two options to increase its treatment capacity:

  1. Purchase additional treatment capacity rights from the Metro system; or
  2. Construct a new 6 mgd independent wastewater treatment plant (WWTP) in Chula Vista; the WWTP would provide the community with a new source of recycled water for non-potable use.

To address the various constraints within the City, RMC is exploring various types of wastewater treatment plants that are condensed, neighborhood friendly, and innovative. This page presents eight potential locations within the City of Chula Vista to site a new WWTP and provides information on each site as well as a comparison of the sites. This page also identifies the preferred sites based on engineering criterion and public comment.

Wastewater Treatment 101

Click to Enlarge Click to Enlarge

Click to Enlarge

Potential Sites

The City identified eight potential sites within the City of Chula Vista as possible locations to site a new water reclamation facility. Black arrows show the general direction of wastewater flow. Existing sewer and recycled water lines are also shown for use in site comparison. All wastewater from the City currently flows to the Point Loma Treatment Plant.

Engineering Site Evaluation - Summary Findings and Conclusions

The following provides a description of our evaluation and findings for each criterion.

Chula Vista Engineering Site Evaluation
Click to Enlarge
 
Site 1
Faivre & Hollister
Click to Enlarge Location: 2378 Faivre St at Hollister St.
Lot Size: 6.4 Acres
Neighborhood: Industrial
Existing Planned Land Use: Limited Industrial Precise Plan
City-Owned Property: No
Site 2*
Main &
Beyer
Click to Enlarge Location: 1720 4th Ave at Main St.
Lot Size: 4.2 & 7.5 Acres (2 lots)
Neighborhood: Industrial
Existing Planned Land Use: Limited Industrial Precise Plan
City-Owned Property: No
Site 3*
Main St &
Mace St
Click to Enlarge Location: 187 Mace St
Lot Size: 3.5, 1.3 & 1.7 Acres (3 lots)
Neighborhood: Industrial
Existing Planned Land Use: Limited Industrial Precise Plan
City-Owned Property: No
Site 4
Davies Property
Click to Enlarge Location: South of Kohl's at 1870 Main St.
Lot Size: 6.6 Acres
Neighborhood: Retail, future Residential
Existing Planned Land Use: Floodway
City-Owned Property: No

Site 5*
Maxwell Rd. & Main St.

Click to Enlarge Location: Maxwell Rd & Main St
Lot Size: 6+ Acres (3 lots)
Neighborhood: Commercial
Existing Planned Land Use: Industrial Precise Plan
City-Owned Property: No
Site 6
San Diego Country Club
Click to Enlarge Location: 912 Third Avenue
Lot Size: 3.2 Acres
Neighborhood: Residential
Existing Planned Land Use: Central Community Precise Plan
City-Owned Property: No
Site 7*
Landfill Site
Click to Enlarge Location: Chula Vista Landfill
Lot Size: 54 Acres
Neighborhood: Industrial
Existing Planned Land Use: Industrial Park
City-Owned Property: Yes
Site 8
Sunbow Property
Click to Enlarge Location: Olympic Parkway
Lot Size: Varies
Neighborhood: Industrial
Existing Planned Land Use: Planned Community
City-Owned Property: No
* Preferred Sites

Size

Each site was evaluated on whether it was the adequate side to site a recycled water treatment plant, advanced treatment facilities required for live stream discharge, and also whether it had sufficient space for a community park. For the smaller sites it was noted if conventional treatment such as Sequencing Batch Reactor (SBR) compared to a member bio reactor (MBR) was feasible.

  • Site 1 is relatively small and will require a very long recycled waster pipeline to connect to OWD pipeline.
  • Site 5 is relatively small and does not allow much treatment flexibility.
  • Site 6 is not of sufficient size and has a high pipeline cost.

Wastewater Availability

This evaluation considers how to get adequate wastewater to the site to achieve the wastewater capacity goals of the project. Wastewater availability was determined for each site based on our build-out conditions.

The sites east of I-805 will not have adequate wastewater flow from a single sewer and will require diversions from both the Poggi Canyon Trunk Sewer and the Salt Creek Interceptor to get to 6 MGD.

Pumping

This evaluation considers relative site differences in pumping. In all cases we will need to pump wastewater through the treatment plant and then pump recycled water to the Otay Water District (OWD) system. However many of the sites will need to have separate sites for the wastewater diversion pump stations because we cannot flow by gravity from the sewer to the treatment plant.

  • All the sites will have similar total pumping head because we are taking wastewater from the sewer at relatively low elevation and pumping recycled water up to elevation 450 ft.
  • The sites north of Main Street will require separate sites for the diversion pump station: the sites south of Main Street can flow by gravity to the treatment site where the diversion pump station can be located.

Piping

This evaluation considers the total length of pipe of both the sewer diversion pipe of both the sewer diversion pipe to the treatment plant and the recycled water pipe from the treatment plant to OWD.

  • The sites west of I-805 will have a short sewer diversion pipeline but a long recycled water pipeline.
  • Site 1 has a very long total pipeline distance and thus a higher cost than other sites south of Main Street.
  • Site 6 has extremely large total pipeline distances and thus a very high cost.

Next Steps

The study will provide the necessary information on the preferred sites to compare the construction and operation of a treatment plant in Chula Vista to the City of San Diego or other agency's price for the additional treatment capacity required to meet Chula Vista's ultimate needs.  Staff will present to Council said information.  The study is anticipated to be complete at the end of the calendar year.   

If you have any questions regarding this study please contact Robert Yano via email or at (619) 476-2402.